[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Portland Construction Cost Comparison Methodology



With respect to the Portland Water Bureau Construction Cost Comparison Methodology I mentioned in my last message to this forum:
 
I just noticed that the Portland Water Bureau has a link on its web site to a PDF file (requires Adobe Acrobat) with the methodology.  You can go to the Water Bureau's web site index at http://www.water.ci.portland.or.us/siteindx.htm and click on the link to the methodology at the bottm of the page, or go directly to the methodology PDF file at http://www.water.ci.portland.or.us/pdf/cm.pdf
 
--Paul Epstein
--------------------------------------------------------
Epstein & Fass Associates, 140 Nassau St., Suite 9C, New York, NY 10038

Phone: 212-349-1719 Fax: 212-349-4054 e-mail: epstein@pipeline.com